久久亚洲精品无码,欧美牲交,精品香蕉一区二区三区,欧美性插b在线视频网站

Product search
Electrical Control System of Double-inlet and Double-outlet Coal Mill

Electrical control system of double-inlet and double-outlet coal mill includes low voltage cabinet for control auxiliary equipment, electrical ear measurement device for controlling and monitoring material position and differential pressure measurement device. Low voltage PLC cabinet is the core of control system control and monitors, the mill operation through receiving the entire signal and transmitting the signal to center control DCS system by bus interface. With the ladder diagram program required by equipment production technology, according to the input command signal, PLC shall judge and logical process and send relevant command to make sure all the parts of mill operate efficiently. 

 

NHI double-inlet and double-outlet coal mill electrical control system with advanced automatic control equipment can achieve the following function; mill can operate safely and continuously around 300 days with no faults. During the running of mill, wearing parts can be filled in with mill non-stop, and mill can response fast according to load variation. Mill can realize double-inlet and double-outlet, single-inlet and double-outlet and semi-grinding according to the requirement of boiler load. More than 400 NHI production coal mill electrical systems are in safe operation in the coal-fire power field in Southeast Asia and North America.

主站蜘蛛池模板: 灵川县| 汾西县| 松江区| 赤壁市| 富阳市| 谢通门县| 资中县| 措美县| 龙山县| 广宁县| 保靖县| 和林格尔县| 齐齐哈尔市| 阜康市| 通渭县| 凤山县| 桓台县| 邯郸市| 通渭县| 长泰县| 张北县| 雅江县| 乾安县| 呼和浩特市| 昌都县| 泗水县| 唐山市| 诸城市| 南华县| 五常市| 天镇县| 淮南市| 云安县| 神木县| 潞城市| 舞钢市| 西乌珠穆沁旗| 靖州| 吉首市| 雷山县| 施秉县|