久久亚洲精品无码,欧美牲交,精品香蕉一区二区三区,欧美性插b在线视频网站

NHI Headlines

NHI’s TBM creates a successful open for the extension line between Beijing and Tianjin

Published:2015-04-07

Recently, that the Φ11.97m slurry balance TBM calledNO. 45 of SHMG emerged through 18 months work. It marks the successful open for the extension line between Beijing and Tianjin, which is the national key construction project in China.

The full length of the extension line between Beijing and Tianjin is 44.815 kilometers, for the only one TBM tunnel with 2.8 kilometers; the Φ11.97m bentonite slurry balance TBM with air cushion type from our company is used in the part of 2.25 kilometers. The installed total power of the equipment is 3960kw. The length of main body is 50 meters and the weight is 1300 tons.

It creates another successful achievement after that NHIs TBM is used in the national projects of high-speed rail SHIZIYANG tunnel between Guangzhou and Shenzhen, Wuhan river tunnel as the first tunnel of Yangtze River, the railway underground line for Beijing and Tianjin in China. 

主站蜘蛛池模板: 天祝| 鞍山市| 祁门县| 永福县| 称多县| 陇川县| 高尔夫| 张家口市| 兰考县| 珲春市| 碌曲县| 米脂县| 宝清县| 梁平县| 郸城县| 永靖县| 湘潭县| 黄山市| 临城县| 罗平县| 绥化市| 甘肃省| 许昌市| 喀喇沁旗| 仲巴县| 洛阳市| 台北县| 湘阴县| 正蓝旗| 德格县| 西丰县| 广元市| 开原市| 长汀县| 比如县| 沛县| 汶川县| 右玉县| 定陶县| 手机| 太和县|